JOBO Lift for CPE-2 / CPE-3
€ 489.00
Price VAT included
With the JOBO Lift the work with your CPP2/CPP3 is significantly improved. Installation and de-installation of the tank is easily avoided.
Filling with chemistry is possible during running rotation. Emptying the chemistry is as easy as operating the lift. This means: no more wet hands, more exact process timing, quicker and more equal chemistry distribution across the film/paper in process. Recycling your chemistry also becomes a tiny effort.